New doors, drawer fronts and hardware installed over your existing cabinet frames — a fraction of the cost and downtime of full replacement, done in about a week.
Refacing works because your cabinet boxes — the part that's expensive to rebuild — usually aren't the problem. It's the doors, finish and hardware that look dated.
We measure every door/drawer and you choose door style, finish and hardware.
Doors and veneer are fabricated to your kitchen's exact dimensions off-site.
Old doors removed, veneer applied, new doors and hardware installed — typically 1–2 weeks.
| Scope | Range |
|---|---|
| Per cabinet door | $160 – $230 |
| Per linear foot | $180 – $310 |
| Full kitchen refacing project | $5,000 – $15,000 |
Reflects general 2026 South Bay market data. Your exact price depends on cabinet count, door style and finish — book a consultation for a fixed quote.
Your cabinet boxes are usually structurally fine — refacing replaces the parts that wear out visually (doors, finish, hardware) while keeping the sound structure underneath.
No — refacing keeps your existing footprint. If you want to move cabinets or change the layout, that's a full remodel.
Most San Jose kitchens are done in 1–2 weeks, much of which is off-site fabrication — your kitchen stays usable for most of that time.
No — refacing is cosmetic and doesn't require a City of San Jose permit.
Book a free consultation — we'll measure your cabinets and show you door/finish options with a fixed quote.
Book Your Free Consultation